This past weekend we made good progress thanks to the extra help from my mom and dad, who came and helped Friday night and all day Saturday. My "to-do" list is always longer than what we have time for, but we were able to complete the top priorities:

-Wipe all wood trim in office and master with Old English wood polish.
-Replace the door handles on the front door, door from the garage to the kitchen, and the door from the kitchen to the deck.
-Rekey all locks.
-Replace light fixtures in master bedroom, eating area, and basement.
-Replace electrical outlets and faceplates in master bedroom.
-Spackle gashes and gouges in guest room; sand down and repaint walls.
-Prime laundry room.

We also did a few things I hadn't planned on - like fixing the door from the master to the deck and giving the front door a fresh coat of paint before putting the new hardware on it. My dad, "Mr. Fix It," also investigated the problem with the icemaker/water dispenser on the fridge.

The other major thing we did this weekend was moving our big items to the house. Joel and I made two trips with the moving truck; one to the storage unit and one to the other house. Besides some select clothes, bathroom and kitchen items, everything is at the house.

The office and the master are done, with the exception of the doors. Those still need to be repainted. Our goal is to finish off the guest room and laundry room yet today or tomorrow. After that, we'll move into the more public areas of the main floor: hallway, living room and kitchen. The hallway and living room will just get touch-ups. The kitchen is transforming to a whole new color (green sprout).

We are making progress, I remind myself when the amount of "to dos" outweigh the "completed" items. Slowly but surely.